In La Pampa, Argentina, the Salinas Gestau operation near Puelches reported a significant leap in extraction productivity, reaching 1,000 meters per day. This is a substantial increase from previous campaigns that averaged 150–200 meters.
The gain is attributed to improved operational execution and accumulated learning. Such productivity steps typically translate into lower unit costs and more predictable delivery cycles for bulk salt contracts in the region.

